4.6.3. Removal and installation of the inlet pipeline
Inlet pipeline of M120.980 engines
Removal
Details of installation of the inlet pipeline of M120.980 engines (the arrow showed a lock uvula of a cover of the distributor)
|
6 — the Control lever throttle gate 10 — the Arm 14, 15, 16 — Bolts 17 — Blocking plugs 17/2 — the Returnable fuel-supply line 17/3 — the Forcing fuel-supply line 18 — Laying |
18/1 — Uplotniteli 19 — the Inlet pipeline 19/1 — the Intermediate flange 20 — a distributor Cover 27 — the Guide 28 — the Plastic clip 30, 98 — Cables of management |
|
1. Remove the air filter. 2. Remove the electronic drive of management of a butterfly valve together with the case of a butterfly valve. 3. Remove a sleeve with wires over the inlet pipeline. 4. Uncover (20) distributors. By means of the screw-driver unhook a uvula. 5. Disconnect all sockets of conducting passing fashion the inlet pipeline and remove all electric components attached to the inlet pipeline. 6. Disconnect vacuum tubes from the components fixed on the inlet pipeline. 7. Disconnect a cable (30) from the lever of a butterfly valve (6). 8. Squeeze a plastic clip (28) and remove an arm (10) together with a cable (30). 9. Disconnect a cable of management (98). 10. Dump pressure in the fuel distributive highway by means of the special valve. 11. Disconnect forcing (17/3) and returnable (17/2) fuel-supply lines. 12. Turn off bolts (14). 13. Disconnect vacuum tubes on both sides of the inlet pipeline. 14. Disconnect tubes of recirculation of the fulfilled gases from the inlet pipeline. 15. Remove an intaking air duct. 16. Turn off bolts (15). 17. Lift the inlet pipeline (19) and remove it. 18. Remove an intermediate flange (19/1). 19. Replace laying (18). Laying has to be placed on blocking plugs.
|
|
Installation
Installation is made as it should be, the return to removal. Adjust management of a butterfly valve. Check and adjust idling turns.
Inlet pipeline of M120.982 engines
Removal
Details of installation of the inlet pipeline of M120.982 engines (the arrow showed a lock uvula of a cover of the distributor)
|
14, 15, 16 — Bolts 17 — Blocking plugs 17/2 — the Returnable fuel-supply line 17/3 — the Forcing fuel-supply line |
18 — Laying 18/1 — Uplotniteli 19 — the Inlet pipeline 19/1 — the Intermediate flange 20 — a distributor Cover |
|
1. Remove the air filter. 2. Remove the electronic drive of management of a butterfly valve together with the case of a butterfly valve. 3. Uncover wires over the inlet pipeline. 4. Uncover (20) distributors. By means of the screw-driver unhook a uvula. 5. Disconnect all sockets of conducting passing over the inlet pipeline and remove all electric components attached to the inlet pipeline. 6. Dump pressure in the fuel distributive highway by means of the special valve. 7. Disconnect forcing (17/3) and returnable (17/2) fuel-supply lines. 8. Turn off bolts (14). 9. Remove an intaking air duct. 10. Turn off bolts (15). 11. Turn off a bolt (19/10) of fastening of an arm (19/11). 12. Disconnect the tank of the pump of the amplifier of the helmsman management and fix it sideways. 13. Lift the inlet pipeline (19) and remove it. 14. Remove an intermediate flange (19/1). 15. Replace laying (18). Laying has to be placed on blocking plugs.
|
|
Installation
Installation is made as it should be, skim milk to removal. Adjust management of a butterfly valve. Check and adjust idling turns.