90fcb7d0

4.6.22. Removal and installation of the pallet of a case of the engine

Details of installation of the pallet of a case of the engine

Removal

 PERFORMANCE ORDER

1. Take off a generator drive belt.
2. Remove the air filter with the measuring instrument of an air stream
3. Disconnect a negative wire from the battery.
4. Remove the lower protective guard of the engine.
5. Merge motive oil.
6. Disconnect the conducting socket from the oil pressure sensor on an oil distribution (18).
7. Unscrew the AT (17) pipelines from the pallet (20).
8. Unscrew pipelines of admixture of air in an exhaust (15) in the lower part of the pallet (18) and the left and right arms of the engine.
9. Turn off an oil distribution (18).
10. Disconnect the socket (2) from the sensor of level of oil (S43) in the pallet (20).
11. Turn off bolts (14) of fastening of the pallet.
12. Remove the forward stabilizer of cross stability.
13. Remove forward springs (21).
14. Unscrew the shock-absorber (27) from below.
15. Turn off both lower forward support of the engine (09) from forward arms (28).
16. Install the elevator (060) of the engine.
17. Tighten lifting eyes of the engine in front and behind.
18. Turn off the directing pipe of the index of level of oil (3) from a cover of a head of the block of cylinders.
19. Turn off a guard (26) of the hinge of a steering shaft (25) and fix it sideways.
20. Disconnect the hinge of a steering shaft (25).
21. Lift the engine by means of a jack (070).
22. Remove back covers of bolts (22).
23. Turn off bolts (22) lobbies of a support (28).
24. Lower a forward part of the engine (28) until is possible to remove the pallet.
25. Remove the generator (13).
26. Unscrew the AT (16) pipelines and (17), remove the oil heater (11), the conditioner compressor from the pallet.
27. Turn off the directing pipe of the probe of measurement of level of oil (3) from the pallet.
28. Turn off bolts of fastening of the pallet.
29. Lower the pallet (20) and remove it, having moved forward.
30. Replace laying (21).

Installation

Installation is made as it should be, the return to removal.

Order of tightening and weakening of bolts of fastening of the pallet of the engine.

1 — M6x22 Bolts
2 — M6x50 Bolt
3 — M6x85 Bolts
4 — M8x40 Bolts
5 — M10x40 Boats