90fcb7d0

4.5.12. Removal and installation of valves

Removal

Details of installation of valves

2 — the Basic rack
3 — Gidrokompensator
5 — the Persistent detail
6 — Nippers

7 — the Support
8, 23 — the Bolt
9 — Press the lever
14 — Crackers
15 — the Top clamp of a spring


Establish a head of the block of cylinders (87) on the basis (24). Establish an insert (25) on the basis (24) in the direction of an arrow (26).

 PERFORMANCE ORDER

1. Tighten a head of the block of cylinders (87) to the basis (24) by means of bolts of fastening of a head of the block of cylinders in front and behind in the direction of an arrow (26).
2. Establish a basic rack (2) with a support (7) in not the central situation.
3. Tighten a basic rack (2) two bolts of M7x35 (bolts of fastening of covers of bearings).
4. Remove hydrocompensators (3) from each cylinder.
5. Press attach the lever (9) with a persistent detail (5) to a support.
6. Attach a persistent detail (5) vertically to a clamp of a spring (15).
7. Fix a support (7) by a bolt (8).
8. Squeeze a spring (17).
9. Remove crackers of the valve (14).
10. Remove a spring of the valve (17) together with a clamp (15).
11. Replace an epiploon of the valve (19).
12. Remove the lower clamp of a spring (20).
13. Remove a head of the block of cylinders (87) from the basis and remove valves (21).

Installation

Installation is made as it should be, the return to removal.