90fcb7d0

9.4. Automatic transmission 722.6

Removal and the AT installation with the rotation converter (hydrotransformer)

Removal

Details of installation of assembly of AT with the hydrotransformer

4 — the Drain stopper of the pallet
9 — the Drain stopper of the hydrotransformer
26 — I Will corrode conductings
33 — the gear shifting Lever
46 — the grounding Tire on "weight"
49 — the Oil pipeline
61 — Maslozalivnaya a tube
62 — the Guard
63 — Draft of gear shifting

64 — the Back arm of fastening of an exhaust pipe
65 — an engine Arm with a support
66 — the Driveshaft
80 — the Cable of inclusion of blocking at the parking
81 — a hydrotransformer Cover
94 — the Exhaust pipe
95 — the Bolt


 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. Pick up the maslozalivny phone (61) from the engine.
3. Turn off a drain stopper (4) from the pallet of transmission and merge gearbox oil.
4. Turn off a drain stopper (9) from the hydrotransformer and merge gearbox oil.
5. Remove a guard (62) and disconnect the 13-contact socket (26).
6. Disconnect a cable (80) of inclusion of blocking at the parking.
7. Turn off bolts (95) of fastening of the hydrotransformer to a drive plate, then uncover the hydrotransformer (81).
8. Turn off the left and right oil pipelines (49) from the oil heater.
9. Remove draft of gear shifting (63), having disconnected for this purpose a clamp.
10. Remove an arm (64) fastenings of an exhaust pipe.
11. Disconnect system of release (94).
12. Remove a fan casing from a radiator (see the Head of the Cooling system, heating).
13. Turn off a back arm of the engine with a support (65).
14. Unscrew the driveshaft (66).
15. Disconnect a connection wire on "weight" (46) from transmission.
16. Turn off bolts of fastening of transmission to the block of cylinders and remove it down at an angle.
17. Remove the hydrotransformer.

Installation

Installation is carried out as it should be, the return to removal.