12.4.10. Removal and installation of the valve of adjustment of clearance
Details of installation of the valve of adjustment of clearance of a body
|
50 — the Distributive valve 52 — the Distributor 54 — Connecting draft Y36 — the Valve of adjustment of clearance of a body |
|
Removal
|
1. Remove a forward right wheel. |
2. Turn off three bolts (arrow) and remove a guard (a) on the right wheel arch. |
|
3. Disconnect the forcing pipeline (R) from a steel tube. Merge liquid. |
|
4. Disconnect connecting draft (54) from the lever on the regulator (6). |
|
5. Remove - the valve (Y36), having removed a collar of fastening of the valve, disconnect conducting sockets from (Y36) and (Y37) valves. |
|
6. On the models delivered to the USA: disconnect connecting draft (15) from the lever on the regulator (6). |
|
7. Turn off fastening bolts (52c), lift the distributive valve (50) from the distributor (52) and carefully remove it. |
|
8. Turn off bolts (50e), disconnect the valve (Y36) from the distributor (50). |
|
|
Installation
Installation is carried out as it should be, the return to removal.
Always replace sealing rings.
Before installation, wipe sealing surfaces and all details. Check correctness of installation of sealing rings.