90fcb7d0

10.3.3. Removal and CV JOINT installation of power shafts and their protective covers

Removal

Design of hinges of a power shaft and detail of installation of their protective covers

37a — the Power shaft
37b — the External hinge
37s — the Internal hinge
37d — a hinge Nave
37e — the Ball
37f — the Separator

37g — the Lock ring
37h — the Cover
37i — the Epiploon
37k — the Collar
37l, 37m — Protective covers


 PERFORMANCE ORDER

1. Remove a power shaft.
2. Remove collars (37k).
3. Uncover (37h) and an epiploon (37i) on a hinged ring (37s).
4. Remove a lock ring (37g).
5. Remove a protective cover (37l) with an epiploon (37i).
6. Remove the internal hinge (37s) - (37f) from a power shaft.
7. Remove a protective cover (37m).

Installation

Installation is carried out as it should be, the return to removal. Stuffing of the internal hinge will require about 120-150 g of lubricant, external - 120 g.