90fcb7d0

10.1.1. Removal and installation of coupling

Coupling design

5 — the Conducted disk
6 — Press a disk
7 — the coupling switching off Bearing

8 — the coupling switching off Lever
9 — the Bolt
02 — the Adjusting tool

Removal

 PERFORMANCE ORDER

1. Remove the transmission (see the Head Korobk of gear shifting).
2. Turn off bolts (9).
3. Remove press a disk (6) and the conducted disk (5).
4. Check press a disk (6) and the conducted disk (5).
5. Check a flywheel and the directing bearing for lack of wear.
6. Remove the persistent bearing of switching off of coupling (7).
7. Remove the lever of switching off of coupling (8).

Installation

Installation is carried out as it should be, the return to removal.